Footbridge Centraal Station
2007, Rotterdam, The Netherlands
In June 2004, Team CS, a collaboration of Benthem Crouwel Architekten, Meyer en Van Schooten Architecten, and West 8 urban design & landscape architecture b.v., has received the commission to execute the vision presented for the new Rotterdam Central Station.
The first part of the new public transport terminal is a 135m long footbridge, situated on the west side of the station and connecting all 16 platforms. Rail passengers at Rotterdam Central Station can make use of the new footbridge across the tracks and construction of the roof will start in the near future.
Lenght: 135m
Surface: 675m
Engineer: Arcadis
Contractor: Peters Stahlbau gmbh
- client
- ProRail/City of Rotterdam
- partners
- Benthem Crouwel Architecten and Meyer en Van Schooten
- consultants
- Arcadis
- team
- Adriaan Geuze, Joost Koningen


