
Construction West 8’s bridge design for Oirschot starts
Consortium Ballast, (Ballast Nedam in collaboration with a team consists of wUrck, Wagemaker, Wijma Kampen and Nauta Heeg) will help municipality of Oirschot for the elaboration and construction of West 8’s original and monumental Moorland-Bridge design at Wilhelminakanaal of Oirschot city, nearby Eindhoven, the Netherlands. The consultant team led by Ballast Nedam will work on the design criteria set out by West 8 together with the municipality of Oirschot. The original bridge design and architectural study was presented in 2017 to the public.